Skip to content

FABRA s.r.o. // Industrial installation

Industrial installation of piping and steel structures.

Subcontractor for industrial projects in Germany and other EU countries.

Request capacity

550 650 1000 600 700 600 750 850 DN 100 DN 65 DN 40 N 1 2 3 4 5 6
  • weld
  • bolts
  • 1flange
  • 2gate valve
  • 390° elbow
  • 4tee
  • 5reducer
  • 6pipe

Illustrative isometric, dimensions in mm

In business
since 2018
Liability insurance
2 million EUR
Welder qualifications
EN ISO 9606-1
Company
FABRA s.r.o.
Sheet
01 / 07

Sheet 02 / 07Services

What we do for you

t cap pass root pass
Circumferential weld

Service 01

Piping and welding

Installation of pipe runs to isometric drawings in industrial plants. Welders qualified to EN ISO 9606-1 for TIG (141), MAG (135), MIG (131) and MMA (111). Stainless and carbon steel; aluminium and copper with qualifications to EN ISO 9606-2 and 9606-3.

  • EN ISO 9606-1
  • TIG 141
  • MAG 135
  • MIG 131
  • MMA 111
  • Isometrics

Service 02

Steel structures and metalwork

Erection of steel structures, platforms, supports and railings. We prefabricate parts and assemblies to drawing in our workshop and assemble them on site.

  • Steel erection
  • Prefabrication
  • Site welding
  • Anchoring

Service 03

Cable trays and ladders

Installation of cable trays, cable ladders and support structures, and cable laying to the design in industrial plants, logistics centres and production halls.

  • Cable trays
  • Cable ladders
  • Support structures
  • Cable laying

Sheet 03 / 07Workshop and prefabrication

Whatever can be prefabricated, we build in our workshop

In our workshop in Kamenice nad Lipou we manufacture parts and assemblies to your drawings. We deliver them to site with our own lorry and install them. This shortens installation time on site and reduces the work inside the operating plant.

  1. 1Drawing

    DN 300 · R 457 22001700

    To your drawings

  2. 2Prefabrication

    We manufacture parts and assemblies in the workshop

  3. 3Transport

    We deliver them to site with our own lorry

  4. 4Installation

    We install them on site

Equipment
  • Plasma cutting
  • Band saws
  • 3D welding tables
  • EWM welding equipment
  • Abrasive blasting
  • Painting
Transport
6.5 t lorry with tail lift and trailer

Sheet 04 / 07On site

On-site deployment

Supervision
Team leader on site, communication in German or English.
Equipment
Own vehicles, tools and welding equipment.
Scheduling
Shift work and shutdowns, including weekends and public holidays.
  • 2018

    Year founded

  • 2 million EUR

    Liability insurance

  • 8 countries

    Germany, Czechia and six other European countries

  • EN ISO 9606-1

    Welder qualifications

Sheet 05 / 07Documents

Documents you receive in advance

We send you our company documentation before work begins.

Isometric drawing: an upright lever arch file with a spine label highlighted in the accent colour, beside it a folder holding five sheets with staggered index tabs, with lines of text and a stamp on the top sheet.
Documents you receive in advance
ItemDocumentNote
1 Liability insurance Limit of indemnity CZK 50 million including product liability, worldwide cover excluding the USA and Canada.
2 A1 certificates For posted workers.
3 Construction withholding tax exemption certificate Under § 48b EStG (Freistellungsbescheinigung).
4 Welder qualifications To EN ISO 9606-1.
5 Extract from the Commercial Register With certified German translation.

Sheet 06 / 07Where we have worked

Plants where we have worked

We work mainly in Germany and Czechia, and have also completed projects in Hungary, France, Luxembourg, the Netherlands, Sweden and Norway.

Industries

  • Isometric drawing: stainless steel cylindroconical tank on three legs, outlet from the cone through an elbow into a pipe with a butterfly valve, inlet pipe from the nozzle on the top run down along the shell on pipe clamps and finished with a flange; circumferential pipe welds and the valve lever highlighted in the accent colour. The drawing is assembled part by part.

    Food industry

  • Isometric drawing: steel frame of a log conveyor with pockets holding three spiked rollers on shafts carried in pillow block bearing housings, V-belt pulleys on the near shaft ends linked by two belts, a log with growth rings on its end face resting on two rollers; bearing housings and their bolts highlighted in the accent colour. The drawing is assembled part by part.

    Wood processing

  • Isometric drawing: two parallel heating pipes, flow and return, each with a ball valve and lever, a circulation pump with motor and terminal box between unions on the flow pipe; ball valve levers highlighted in the accent colour. The drawing is assembled part by part.

    Plumbing and heating

  • Isometric drawing: stainless steel swimming pool tank in a concrete pit, floor and walls made of sheet panels, overflow edge and ladder; welded seams of the floor and walls highlighted in the accent colour. The drawing is assembled part by part.

    Swimming pools

Countries

  • DEGermany
  • CZCzechia
  • HUHungary
  • FRFrance
  • LULuxembourg
  • NLNetherlands
  • SESweden
  • NONorway

References and client contacts are available on request.

Sheet 07 / 07Contact

Need to strengthen your team or have parts prefabricated?

Tell us the dates, location and scope of work. We will get back to you with a proposed crew and a quotation. On request we will send our company documentation and worker profiles.

Managing Director

Daniel Bidmon

+420 731 838 383

bidmon@fabra-group.com

Project coordination and sales

Rudolf Kozel

+420 777 261 445

kozel@fabra-group.com

Registered office

FABRA s.r.o.
Žižkova 1696/15
586 01 Jihlava

Information on how we process personal data is given in our Privacy policy.

Map: © OpenStreetMap contributors

Workshop

Kamenice nad Lipou
Na Kariánce 315
Get directions